Here are a few results from the BIM Manager Survey that was conducted in April/May 2009.
The slides below compare the 2008 survey to the 2009 survey. By comparison, you can see the increase in some of the areas we covered.
![Related Posts with Thumbnails](http://www.linkwithin.com/pixel.png)
No Comments
Filed under:
BIM Management, Survey