Table of contents for What should be Modeled?

  1. What should the Architect Model?

Electrical – what should they model? How about this as a starting point?

  • Conduits 2″ or greater or, smaller conduits if in ganged runs.
  • Ganged runs shall be modeled as a mass.
  • Cable tray, access zones, and equipment to be included in the model.
  • Light fixtures, locations and space requirements.
  • Any access zones requirements will be modeled.
  • Minimum clear space above electrical panels shall be modeled

Not enough? Too much?

Related Posts with Thumbnails