Table of contents for What should be Modeled?

  1. What should the Architect Model?
  2. What should Structural Model?
  3. What should HVAC Model?
  4. What should Electrical Model?
  5. What should Plumbing Model?

Electrical – what should they model? How about this as a starting point?

  • Conduits 2″ or greater or, smaller conduits if in ganged runs.
  • Ganged runs shall be modeled as a mass.
  • Cable tray, access zones, and equipment to be included in the model.
  • Light fixtures, locations and space requirements.
  • Any access zones requirements will be modeled.
  • Minimum clear space above electrical panels shall be modeled

Not enough? Too much?

Related Posts with Thumbnails If you enjoyed this post, make sure you subscribe to my RSS feed!